Patience

I had to tink* (That’s for you, Leah!)  back to beginning of the gull pattern on the February Baby Sweater.  I’ve made some headway but it’s still not ready to travel with me to work on during lunch.  I need to be confident in what I’m knitting so I don’t have to carry all my gear in case I need to tink.

I made another swiffer cover.

Mr. Aitch and I tried to MacGyver** our vacuum cleaner on Monday.  It’s a canister type and has a “power head” that is controlled by a switch on the handle.  This thing is nine years old and was designed to fail at the connection between the handle and the wand/power head.  The electrical connection has too much give so when you push the handle/wand/power head, it works.  Pulling it back disconnects the power.  So we cut a synthetic wine cork and tried to wedge it into the space so the connection would stay.   Didn’t quite work.  I thought I would try it again and cut a bigger piece of cork wanna-be.

Mr. Aitch doesn’t have the patience and just ordered a new vacuum.

Sometimes I have too much patience.

*tink is knit spelled backwards.  Used when you have to unknit, frog, or rip out a few rows or stitches.

**MacGyver was a 1980’s TV show starring Richard Dean Anderson.  He used everyday things to get out of harm’s way such as a paper clip to disarm a nuclear weapon.

Swiffer cover and technology

I should be getting my computer back today!  I do not want to risk losing everything again.  Mr. Aitch has an external hard drive (why does that sound a bit naughty?) that I will be using as well to save all my precious craftiness.  No more being without all my electronic knitting patterns!  Everything will be saved there and may even be burned to disk.  Portability.

Last night I finished a Swiffer cover.  (Thanks Danielle)  It is solid lime green and seed stitch.  Can’t wait to use it.  Wow!  I never thought I’d say that!  I want to make more of these and also some from this pattern.  Thanks Cpezzers) Gonna need more cotton yarn.  I am NOT using leftover Cascade Ultra Pima for these!  No FO pictures yet.  I need wait until I get my computer back.

I am Ravelry challenged.  I cannot figure out how to do anything other than add things to my library.  I don’t even know how to post anything on there to ask for help.  I probably won’t be able to do anything with it this weekend.  Can anyone help me?  Please?

Froggy

I decided to frog te Swiffer cover I knit over the weekend.  I pushed it into the grabbers and it grabbed it alright.  I will find another pattern so it slips over the ends and not into the grabbers.  Do you have a favorite Swiffer cover pattern?  Please leave a comment or link.

I knit to get a finished object but this froggy knitting did give me a chance to perfect my seed stitch.  I love its nubby texture.

Almost finished with the first secret project.  I spent a large part of last night trying to find the last bit that I needed to sew on.  I really, really, REALLY need to organize my yarn stash and supplies.  Waiting until I finish part of the basement is just too long of a wait.  I will be posting for help on this at a later date so start thinking of how you organize your supplies and yarn.

I’m going to call (as soon as the store opens) for an update on my computer.   No computer = more knitting time.  This has given me new insight into what emails I keep and what I delete.  I usually keep most of them except for advertisements.  With a poor memory like mine I need to reread a lot of correspondence.  My on-line Inbox is really full and I should decide what is important.

Weekend progress

Sorry, not photos today of my progress.

Only four more rows to knit on the first MICH mittens.  Then it’s onto the thumb and conversion to a flip top.

Saturday night I knit a Swiffer duster cover from Crazy Aunt Purl’s book Home is Where the Wine Is. using Lily Sugar ‘n Cream in lime green.  I think it is just flat and pushes down into the “grabbers” on the top of the Swiffer.  I haven’t used it yet but I’m wondering if the “grabbers” will tear my cover.  Testing and report due at a later date.  (Like once I get my computer back and in working order.)

Sunday I made half of a secret project for a friend whose birthday was at the end of July.  We met for brunch yesterday and told her I was making something for her and as soon as I finished it, I would send it to her.  I worked on it last night and it’s almost finished now.  I will take pictures before I send it to her.