Is it me or errata?

I decided to finish Ms Ida.  The thumb seemed a bit too tight so I moved up from a size 4 dpn to a size 8.  With the color changes I must be tightening my grip and needed to go up a few needle sizes.   Plus my other dpns were in other projects.

I’m having some confusion with the thumb decreases while following the chart so I contacted the designer. 

I’m wishing I didn’t try to make them flip top mittens but as soon as I finish the thumbs, I’ll see if I can make it all work out.

WWYD?

I really wanted to post this while I was away but my internet access was foiled.  I’ll post about my accomplishments in another post.  I know, you can’t wait.  🙂 

I’ve been working off and on knitting Ms Ida Chain Link mittens since the beginning of August.  I was seriously thinking of keeping them for myself.  In fact I was going to work on them while riding the train.  Did not happen. 

They are, unfortunately, too big.  Really, really big.  My entire hand including the thumb fits in there and they are way too long.  I even ripped part of the top back as I didn’t like how pointy they were. 

Ms Ida Chain Link mittens size: adult medium

 

They are not 100% complete.  No thumb and no flip top yet. 

Mr. Aitch suggested I try to shrink them.  Neither of the yarns are feltable so does that mean they won’t shrink?  Plus they are two different yarns.  One is Knit Picks City Tweed (55% Merino wool, 25% superfine alpaca, 20% Donegal tweed) and the other is Knit Picks Andean Silk ( 55% Super Fine Alpaca, 23% Silk, 22% Merino Wool).   I really don’t want to take the chance and ruin them. 

I see three options: 

  1. Rip them out and make a smaller size.  I made the adult medium.
  2. Finish them and find someone with larger hands to gift them.
  3. Put them away with the other WIPs I don’t know what to do with.

What would you do?

She’s got a ticket to ride…

I leave Monday morning for four days to a conference in Philadelphia.  I’m looking forward to both the journey and the destination.  I’m riding the train and should have twelve travel hours to knit.

So this morning I planned to decide what yarn, needles and projects to take with me.  What I did instead was look at my yarn stash.  I didn’t write down any of the acrylic yarns so I didn’t have as much as I thought I did.  And that’s a good thing.

I need to get over to Ravelry and update my stuff.

Two WIPs are going to be tinked or rather totally ripped out, yarn soaked and unkinked, and repurposed into something else.  I have two sweaters I started for my grandson that will not fit him now.   I’m not sure what to do with:

  1. One almost completed sock for Mr. Aitch and not enough yarn for sock #2.
  2. One orange and green (Yeah, the yarn was on sale) mitten missing the thumb and enough yarn to make the second one but do I really want to?
  3. One self-striping sock yarn wrist warmer but no info on how I made it so making the second one probably won’t happen.

I did decide to take Ms Ida long with me hoping I’ll finish them.  I’m also taking some cotton for a few more swiffer covers, some wool for the Curly Purly soakers, and some miscellaneous yarn for some seamless slippers.

I suppose I’ll need to pack some clothes, too.

Ms Ida progresses

I made great progress on the mittens last night after catastrophe struck.

My computer is very sick and needs surgery.  Hopefully it is life saving surgery as EVERYTHING I have is on that computer.  I was installing the anti-virus program update again when it started to crash.  So those of you who personally emailed me will not be getting a reply since all my messages are now on the disabled computer.

So I knit.  I’m almost finished with the first mitten.  I took pictures of my progress with my phone but I can’t get the pictures off of it.  ARRRG!

I seem to be technologically challenged today.